Modular building

Waters Building

Made in the factory, to be transported and assembled in the industrial complex.

Building constructed to withstand the medium level explosion and projected as a confinement building.

The set consists of 9 reinforced concrete modules made at the factory, to be transported and mounted in the industrial complex.

The building consists of a central module through which the lobby for reception, office area and IT room is accessed. The right area of ​​the building is intended for offices, meeting rooms, and toilets and changing rooms, and the left area is intended for two large work areas.

The building is fully equipped with facilities prepared for confinement and furniture ready for use.

The custom finishes for this project are, internally, parquet flooring in all dry areas, and vinyl flooring in toilets and changing rooms. The interior wall coverings are based on painted plasterboard, false ceilings of recordable plates and in the tiled showers of the walls.

Externally it has a ventilated facade of minionda sheet, fixed exterior carpentry in anodized aluminum and exterior metal doors, all anchored according to specifications of the destination plant.

The roof has been made using a deck system, executed with metal plates on a metal structure with a slight slope, thermal insulation type PUR and butyl cloth finish prepared for the weather.

DETAILS

Date and location: April 2019 Tarragona Industrial Complex

Client: Dow Chemical

Project: Building of reinforced concrete modules for offices, meeting rooms and changing rooms

Surface: 9 pcs 9.85m x 4.85m (429.95 m2)